sb tower, zaha hadid
Location: London
Status: Concept Design Phase
Lift Type: Bespoke Luxury Lift
Premier Lift Group have worked hand in hand with Zaha Hadid Architects in their revamp of the lobby area of the former Kings Reach Tower office building in London which was turned into a residential building by Mace six years ago. The remit from the architects to introduce a new mezzanine area and feature glazed circular lift along with a new concierge desk and lighting scheme for the lobby of the repurposed Southbank Tower. Premier have been appointed to design, manufacture and install the feature circular glazed lift to provide access to the amazing new mezzanine waiting area. Originally due to be installed in 2020, works have been delayed and now are due to be completed in the summer of 2021.
Status: Concept Design Phase
Lift Type: Bespoke Luxury Lift
Premier Lift Group have worked hand in hand with Zaha Hadid Architects in their revamp of the lobby area of the former Kings Reach Tower office building in London which was turned into a residential building by Mace six years ago. The remit from the architects to introduce a new mezzanine area and feature glazed circular lift along with a new concierge desk and lighting scheme for the lobby of the repurposed Southbank Tower. Premier have been appointed to design, manufacture and install the feature circular glazed lift to provide access to the amazing new mezzanine waiting area. Originally due to be installed in 2020, works have been delayed and now are due to be completed in the summer of 2021.
2
STOPS
STOPS
5730 MM
TRAVEL
TRAVEL
0.53 M/S
SPEED
SPEED
630 KG
RATED LOAD
RATED LOAD